Skip to content

Eco Living

The HEX-UNIT modular system

Every xyzgreenliving home is built from hexagonal cross-section timber modules — cut with CNC precision off-site, snapped together on a locally poured Indonesian concrete base. Orbit the model to see how the modules link.

Model 1 — 36 m² two-storey modular home render — closed state

From modules to home

See how our modular homes are built

Take a closer look at modular house construction, then explore the layouts and 3D models below.

Modular house construction · Film 01
Modular house construction · Film 02

Eco Living · 2D + 3D house models

Find your place.

From a 36 m² studio to a 140 m² family villa. Explore our modular homes, compare the layouts, and find the right fit for your land.

Eco Compact Studio render — closed state
MODEL 1

Eco Compact Studio

One hexagonal unit, a mezzanine sleeping deck and a glazed porch.

36
3–4 Months
1 bed · 1 bath
A+ Zero-Waste
Eco Family Villa render — standard state
MODEL 2

Eco Family Villa

A 7 × 10 m two-storey family house with a full-width front balcony.

140
3–4 Months
2 bed · 2 bath
A Zero-Waste
Model 3 reference sketch: L-shaped steel-frame pavilion with intersecting pitched roofs and a recessed entrance
MODEL 3

Eco Luxury Pavilion

An L-shaped pavilion with intersecting pitched roofs and a sheltered terrace.

75
3–4 Months
2 bed · 2 bath
A Zero-Waste

The Process

From your land to your front door.

Local groundwork and factory fabrication move together. Plan for a 3–4 month project, with the final schedule agreed for your site.

  1. 01

    Site Prep & ID Foundation

    Locally built concrete base, drainage and services by Indonesian crews, set to factory tolerance.

  2. 02

    Factory Precision Build

    Modular hex panels manufactured off-site with CNC accuracy, glazing and services pre-installed.

  3. 03

    Rapid On-Site Assembly

    Lego-style snap assembly with steel node connectors — no wet trades, no construction waste.

  4. 04

    100% Livable Home

    Commissioning, finishes and handover. Move-in ready within 3–4 months of groundbreaking.